Model Tech Yak 54 Spécifications Page 17

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 44
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 16
Page 17
STEP 1: INSTALLING THE LANDING GEAR BRACKETS
q Install the two main landing gear brackets onto the fuselage, using six
M4 x 12mm socket-cap screws and six M4 at washers.
STEP 2: INSTALLING THE MAIN GEAR WHEELS AND WHEEL PANTS
q Temporarily install one main gear wheel onto one axle, using two wheel
collars and grub screws, making sure that the wheel is centred on the axle.
q Install one threaded axle onto each landing gear bracket, using two M8
lock nuts. Make sure to tighten the lock nuts rmly to hold the threaded axles
securely into place.
q Carefully measure and cut a 1/2" (13mm) wide slot in the inside of one wheel
pant. The slot should be cut in the centre of the moulded mounting plate and
the top of the slot should be 3/8" (10mm) from the bottom edge of the moulded
mounting plate.
IMPORTANT Measure from the bottom of the moulded mounting plate,
not from the bottom of the wheel pant.
q Slide the wheel pant over the hex hub and the wheel. When aligned properly,
the bottom edge of the wheel pant should be parallel to the bottom edge of the
landing gear bracket.
q While holding the wheel pant in place, draw a mark on the side of the wheel
pant, using the predrilled hole in the landing gear bracket as a guide.
q Remove the wheel pant and carefully drill a 5/32" (4mm) diameter hole
through the wheel pant at the mark you drew.
3/8" (10mm)
Vue de la page 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 43 44

Commentaires sur ces manuels

Pas de commentaire